• Active Study

Public Hearing (February 2020)

TIS SEIS Public Hearing Notice 4.52 MB

The Florida Department of Transportation held a public hearing regarding the Tampa Interstate Study (TIS) Supplemental Environmental Impact Statement (SEIS), which includes I-275 (SR 93) from the Howard Frankland Bridge to north of Dr. Martin Luther King Jr. Boulevard (SR 574) and I-4 (SR 400) from I-275 (SR 93) to east of 50th Street (US 41) in Hillsborough County, Florida. This project involves improvements to the Westshore Area Interchange (I-275/SR 60), the Downtown Tampa Interchange (I-275/I-4), as well as the I-275 corridor that connects these two areas.

The Public Hearing was held on two separate dates and locations to allow for maximum participation. The format of each hearing session and the information presented were identical. The first Public Hearing Session was held on Tuesday, February 25, 2020 from 5:00 p.m. to 7:30 p.m. at the Hillsborough Community College (Dale Mabry Campus), Student Services Building located at 4001 w. Tampa Bay Boulevard, Tampa, FL 33614. The second Public Hearing Session was held on Thursday, February 27, 2020 from 5:00 p.m. to 7:30 p.m. at Port Tampa Bay Cruise Terminal #6, located at 1331 McKay Street, Tampa, FL 33602.

This hearing allowed those interested in the study an opportunity to provide comments and express views concerning the location; conceptual design; and social, economic, cultural, and environmental effects of the proposed project. The hearing covered TIS Segments 1A, 2A, 2B, 3A, and 3B (also referred to as Tampa Bay Next Sections 4, 5, and 6). The FDOT held this public hearing on two separate dates and location to allow for maximum participation. The format of each hearing session and the information presented was identical.

Beginning at 5:00 p.m., FDOT representatives were available to answer questions and discuss the project. Project materials and exhibits showing the proposed improvements were available. A PowerPoint presentation ran continuously during the open house. The formal portion of the public hearing began at 6:00 p.m. and provided the opportunity for oral public comments.

A court reporter was available to receive comments in a one-on-one setting before and after the formal portion of the hearing. You may submit written comments at the hearing, mail your written comments to the address pre-printed on the back of the comment form provided at the hearing, or enter them on the project website at www.tampainterstatestudy.com on the “Send us your comments” page. All comments must be postmarked or emailed by Thursday, March 12, 2020 to become part of the official public hearing record.

Written comments can be mailed to: Kirk Bogen, P.E., Environmental Management Engineer, Florida Department of Transportation District Seven, 11201 N. McKinley Drive, MS 7-500, Tampa, FL 33612, emailed to: D7-TIS@dot.state.fl.us.

Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. If you are hearing or speech impaired, please contact the agency using the Florida Relay Service, (800) 955-8771 (TDD) or (800) 955-8770 (Voice). Persons who require special accommodations under the Americans with Disabilities Act or persons who require translation service (free of charge) should contact Alex Henry, Public Involvement Coordinator, at (813) 975-6405 or by email at: Alex.Henry@dot.state.fl.us at least seven (7) days in advance of each hearing session date.

If you have questions about the project or the hearing, please contact Alice Price, AICP, PD&E Project Manager, at (813) 975-6482, or by email at: D7-TIS@dot.state.fl.us. All materials displayed at the public hearing will be available for download after the Public Hearing has taken place.

Public Hearing Materials

Presentation

Public Hearing Presentation

download presentation as a PDF

Display Boards

Welcome Boards 2.16 MB

Station 1: Project History and Overview 191.71 MB

Station 2: Recommended Locally Preferred Alternative 388.38 MB

Station 3: Visualizations 59.78 MB

Tampa Interstate Study Locally Preferred Alternative: Westshore Area Interchange (I-275/SR 60)

Tampa Interstate Study Locally Preferred Alternative: Downtown Tampa Interchange (I-275/I-4)

Click here to view an online version of the interactive map and photo simulations as shown on the touch screens during the Alternatives Public Workshops.

Station 4: Study Findings 625.85 MB

Station 5: Adjacent Projects 234 KB

Roll Plot I: I-275 from North of Howard Frankland Bridge to North of Hillsborough River 330.33 MB

Roll Plot II: I-275 from North of Hillsborough River to North of MLK Blvd. (I-275) and East of 50th St. (US 41) on I-4 8.90 MB

Documents and information relating to the Tampa Bay Next program and adjacent projects can be viewed on the Tampa Bay Next website (www.tampabaynext.com).
Draft Project Report Documents were available at the Alternatives Public Workshops and on this website. These documents have been updated and are available on the documents tab.
What’s New?

The Florida Department of Transportation held a public hearing regarding the Tampa Interstate Study (TIS) Supplemental Environmental Impact Statement (SEIS), which includes I-275 (SR 93) from the Howard Frankland Bridge to north of Dr. Martin Luther King Jr. Boulevard (SR 574) and I-4 (SR 400) from I-275 (SR 93) to east of 50th Street (US 41) in Hillsborough County, Florida.

 

» read more

Contact Information
For more information or to comment, please contact:

Alice Price, AICP
PD&E Project Manager
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-500
Tampa, FL 33612-6456

Phone: (813) 975-6482
Toll Free: (800) 226-7220

Para preguntas en Español
Valoramos la opinión del público sobre este proyecto. Si usted tiene preguntas o comentarios o si simplemente desea más información sobre este proyecto, por favor ponerse en contacto con el señor Manuel Flores al teléfono (813) 975-4248 o correo electrónico manuel.flores@dot.state.fl.us.