• Active Study

Project Documents

Supplemental Environmental Impact Statement (SEIS) 2017-2020

Alternatives Public Workshops (May 2019)

Presentation

Alternatives Public Workshops Presentation

download PowerPoint Presentation

Display Boards

Welcome Boards 2.16 MB

Zone 1: Study Introduction – TIS History 2.74 MB

Zone 2: Supplemental Environmental Impact Statement (SEIS) Overview 3.09 MB

Zone 3: What Problems Are We Trying To Solve? 3.68 MB

Zone 4: Preliminary Study Findings 17.06 MB

Zone 5: Photo Simulations and 3D Visualizations 1.30 MB

Downtown Tampa Interchange Design Option A

Downtown Tampa Interchange Design Option B

Downtown Tampa Interchange Design Option C

Downtown Tampa Interchange Design Option D

Westshore Interchange

Click here to view an online version of the interactive map and photo simulations as shown on the touch screens during the Alternatives Public Workshops.

Zone 6: Opportunities for Connectivity and Transit 16.32 MB

Zone 7: Northwest (Veterans) Expressway Concept Plans 592 KB

Northwest (Veterans) Expressway (SR 60 / Memorial Highway from north of Cypress Street to north of Memorial Highway) Roll Plot 3.22 MB

Zone 8: SEIS Concept Plans 1.08 MB

No Further Action Roll Plot 5.53 MB

Segment 1A (I-275 from north of Howard Frankland Bridge to north of Himes Avenue) Roll Plot 7.62 MB

Segment 2A (I-275 from north of Himes Avenue to north of Rome Avenue) Roll Plot 2.67 MB

I-275 from North of Howard Frankland Bridge to north of Himes Avenue / Veterans (Northwest) Expressway from Cypress Street to North of Memorial Highway Roll Plot 10.49 MB

TIS SEIS Segments 2B & 3A: Design Option A – Conceptual Alternative Alignment Roll Plot 32 MB

TIS SEIS Segments 2B & 3A: Design Option B – Conceptual Alternative Alignment Roll Plot 32 MB

TIS SEIS Segments 2B & 3A: Design Option C – Conceptual Alternative Alignment Roll Plot 31 MB

TIS SEIS Segments 2B & 3A: Design Option D – Conceptual Alternative Alignment Roll Plot 11 MB

TIS SEIS Segment 3B: Conceptual Alternative Alignment Roll Plot 14 MB

Zone 9: Tampa Bay Next Program and Adjacent Projects 870 KB

Documents and information relating to the Tampa Bay Next program and adjacent projects can be viewed on the Tampa Bay Next website (www.tampabaynext.com).
Draft Supplemental Environmental Impact Statement

Administrative Action Draft Supplemental Environmental Impact Statement / Section 4(F) Evaluation (Draft) 31.68 MB

Administrative Action Draft Supplemental Environmental Impact Statement / Section 4(F) Evaluation Appendices (Draft) 35.66 MB

Draft Engineering Documents

Preliminary Engineering Report – Segments 1A and 2A (Draft) 56.95 MB

Preliminary Engineering Report – Segments 2B, 3A and 3B (Draft) 108.32 MB

Project Traffic Analysis Report (Draft) 118.20 MB

Draft Documents related to Social and Cultural Resources

Conceptual Stage Relocation Plan – Segments 1A and 1B (Draft) 16.12 MB

Conceptual Stage Relocation Plan – Segments 2B, 3A and 3B (Draft) 2 MB

Cultural Resource Assessment Survey Update – Vol I 79.69 MB

Cultural Resource Assessment Survey Update – Vol II 290.68 MB

Economic and Fiscal Impact Analysis (Draft) 8.45 MB

Sociocultural Effects Evaluation (Draft) 21.02 MB

Draft Documents related to Natural Resources

Alternate Stormwater Management Report (Draft) 22.03 MB

Location Hydraulics Technical Memorandum (Draft) 2.73 MB

Location Hydraulics Report (Draft) 50.72 MB

Natural Resources Evaluation – Segments 1A and 2A 6.56 MB

Natural Resources Evaluation – Segments 2B, 3A and 3B 11.86 MB

Pond Siting Report – Segments 2B, 3A and 3B (Draft) 61.31 MB

Water Quality Impact Evaluation Checklist (Draft) 249 KB

Draft Documents related to Physical Resources

Air Quality Technical Memorandum (Draft) 4.13 MB

Contamination Screening Evaluation Report – Segments 1A and 2A (Draft) 60.74 MB

Contamination Screening Evaluation Report – Segments 2B, 3A and 3B (Draft) 37.49 MB

Noise Contour Study Technical Memorandum (Draft) 14.83 MB

Noise Study Report Update (Draft) 17.20 MB

Draft Documents related to Public Involvement Comments and Coordination

Public Workshops Scrapbook – Tampa Interstate Study Historic Resources Meeting (meetings held on 10/09/17 and 10/10/17) 13.96 MB

Alternatives Public Workshop Scrapbook (meetings held on 05/21/19 and 05/23/19) 18.70 MB

Public Hearing Scrapbook (meetings held on 02/25/20 and 02/27/20) 183.46 MB

Original TIS Documents – Prior to 2017

Tampa Interstate Study (TIS) Master Plan

Tampa Interstate Study (TIS) Environmental Documents

TIS Environmental Document Records of Decision (ROD)

Tampa Interstate Study (TIS) Memorandum of Agreement (MOA) and Status

TIS Reevaluations

Supplemental Documents


Supplemental – Environmental & Cultural Resources
Supplemental – Engineering
Supplemental – Traffic Reports
Supplemental – Public Involvement
What’s New?

The Florida Department of Transportation held a public hearing regarding the Tampa Interstate Study (TIS) Supplemental Environmental Impact Statement (SEIS), which includes I-275 (SR 93) from the Howard Frankland Bridge to north of Dr. Martin Luther King Jr. Boulevard (SR 574) and I-4 (SR 400) from I-275 (SR 93) to east of 50th Street (US 41) in Hillsborough County, Florida.

 

» read more

Contact Information
For more information or to comment, please contact:

Alice Price, AICP
PD&E Project Manager
Florida Department of Transportation, District Seven
11201 N. McKinley Drive
MS 7-500
Tampa, FL 33612-6456

Phone: (813) 975-6482
Toll Free: (800) 226-7220

Para preguntas en Español
Valoramos la opinión del público sobre este proyecto. Si usted tiene preguntas o comentarios o si simplemente desea más información sobre este proyecto, por favor ponerse en contacto con el señor Manuel Flores al teléfono (813) 975-4248 o correo electrónico manuel.flores@dot.state.fl.us.